This case study compilation includes: |
|
2002 Karlsruhe , Bulacher Sammler Relining |
|
1390 meter DN 900 (DA 901) PN 1, SN 5000 N/mm, in pipe lengths of 6 m, 3 m und 1,5 m including Reka Couplings (DA 950).
|
|
2002 Kirchdorf-Unteropfingen - Stauraumkanal |
|
120 meter DN 2400, PN 6, SN 5000, 42 meter DN 1200, PN 1, SN 5000 in lengths of 6 m including Reka Couplings and GRP-Shafts DN 2400.
|
|
2001 Pforzheim , Spitalwisenweg/Birkenweg |
|
380 meter DN 600/ 360 m DN 500/ 200 m DN 400/50 m DN 300; Cover depth up to 4 m.
|
|
2001 Dorsten/Wulfen - Nord-Süd-Sammler |
|
1200 meter GRP pipes DN 500; 650 meter GRP pipes DN 1200.
|
|
2001 Dorsten/Marl - Industripark |
|
105 meter GRP pipes DN 150; 3475 meter GRP pipes DN 300 to DN 1500 (all DN steps).
|
|
2002 Sewer pressure pipe line Buxtehude - Hamburg |
|
ca. 20 kilometer GRP pipe line DN 350, 500, 700, PN 10, SN 10000 in lengths 6, 8, 12 m.
|
|
2002 Brückenleitung Tull/Donau (Bridge) |
|
440 meter in lengths of 12 m, Outer pipe: FLOWTITE GRP DN 450, special stiffness of SN 40000 Inner pipe:: Medium pipe Steel DN 300 PN 16 Between outer and inner pipe: foam (100 kg/m³)
|
|
2002 München Airport , new channel Terminal 2, Ramp 3 |
|
2675 Meter GRP pipes DN150 PN1 SN10000 incl. REKA couplings 504 Meter GRP pipes DN200 PN1 SN10000 incl. REKA couplings 1035 Meter GRP pipes DN300 PN1 SN10000 incl. REKA couplings 504 Meter GRP pipes DN400 PN1 SN10000 incl. REKA couplings, pipe length 6 meter
|
|
2002 Meine/Schwülper - SW-Sammler |
|
75 meter GRP pipes DN 250 2000 meter GRP pipes DN 350
|
|
2002 Channelisation "Weiler Schmitten" |
|
950 m GRP pipes DN 200
|
|
2000 Floating installation, Mücheln/Geiseltal - Injection coupling |
|
800 meter DN 1400, PN 10, SN 10000 in lengths of 6, 8, 12 m. |